We were appointed in 2021 to redesign and deliver the Wolves Megastore at Molineux Stadium. The brief called for a significant uplift to the existing store, with a focus on creating a more modern and engaging retail environment for fans.

Our scope included the design and production of new wall fixtures, free-standing displays, counters, fitting rooms, and bespoke furniture. A key requirement was to ensure all elements were not only visually striking but also durable enough to withstand heavy footfall on matchdays and throughout the season.

_ Concept Design
_ 3D Design
_ 2D Design
_ Technical Drawings
_ Production
_ Project Management
_Installation

Design & Technical Drawings

Following the brief, we conducted a complete site survey of the space to get the necessary architectural drawings.

Once the design was agreed our Technical team prepared a comprehensive and detailed pack that included: 2D Layouts, Elevations, and Production Drawings of all the bespoke joinery, signage & metal work.

Bespoke Manufacturing

When we finalised the technical pack, we then started the manufacturing. There was an extensive order for all the bespoke components that were required for the megastore that included: x24 engineered multifunctional centre aisle units, x16 cash desks, various wall displays going up to 4m high with merchandising components, a prominent entrance tower fixture to display product, new fitting rooms, x4 digital screens and all the signage.

Installation

The installation took place over a four-week programme, and our team consisted of fitters, decorators and electricians.

Delivering the project on time for the Wolves' new kit launch was critical, and we completed the project on time and to a high standard.

+
DRAG
EXPLORE
SHOWCASE
EXPLORE
SHOWCASE

Weeks on site

4

We completed the work on site over 4 weeks.

Store size

500m2

It's called a megastore for a reason!

Production timeline

8

The production took place over 8 weeks.

installation team size

‍12

Our core installation team consisted of 12 men.

.

.

More Images

No items found.

Bobblehat's Capabilities Deck...

If you'd like to receive our capabilities deck pdf, please leave your details and we will send it to you.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
01
home
02
about
03
work
04
Services
05
news
06
testimonial
06
gallery
06
contact